Over the past ten days we have been renovating our oldest polytunnel. This tunnel, the Mothership, was already on the farm when the community came here, and we believe it to be 10 to 12 years old. Within a year of us being here the front timbers were starting to come apart, being unable to cope with the weight of tomatoes pulling on them. We have continually patched and repaired the tunnel, but strong winds earlier this month started to tear it apart drastically.
|
Storm damage, early November. |
Both the plastic and timber needed replacing, so we spent two days digging these out and removing them.
|
Rebecca and Chris digging the old plastic out (after lengthy heavy rain!). |
|
Front timbers removed, but plastic still on. |
A strong overnight wind did most of the work of removing the plastic for us. Once off we reconstructed the timber ends of the polytunnel both front and back, finishing this work today. We have also constructed new windows and doors or repaired the old ones, and covered these ready to be re-hung, and begun adding the additional plastic panels at front and back.
|
Back end timbers replaced and ready for plastic. |
The tunnel will be ready to re-cover on Thursday 28th November. The weather forecast is good, with low winds and no rain, and we are aiming for a 9 am start (subject to alteration...). Our usual volunteer session will start at 10 am, but if our regular volunteers can come one hour earlier that would be much appreciated. We are hoping for 10 people, until the cover is secured, and already have 5, so please come along and join in.
No comments:
Post a Comment